POLAR JoggingSystem AirGo Jog
Test the fastest system on the market with your material. Prepare a complete cutting ream with edge accuracy in 60-90 seconds.
With the POLAR AirGo Jog, edge-precise material preparation is fully automatic. A powerful ventilation and alignment station ensures complete, edge-precise cutting reams.
Highest possible degree of automation
- Automatic recording of entire reams
 - Ventilation and alignment of entire reams
 - Fastest ream flow
 - Fast conveying of material without vibration process (e.g. pre-cutting for printing)
 - Remote diagnostics and remote maintenance (software) possible
 - Short set-up time due to program/recipe memory
 
Ergonomics
- Elimination of heavy physical work
 - Reduction in downtime due to illness
 - Prevents carpal tunnel syndrome
 - Relieves the intervertebral disc
 
Flexibility
- Integrated into a cutting system or as a stand-alone version
 - Rear or front table loading of the cutting machine-
 - Upgrade of existing cutting machines possible at any time and with minimum effort
 
- Operating mode can be switched from automatic to manual at the touch of a button
 - Jogging and ventilation unit fully equipped, no options required
 - Any circulation size can be processed optimally and as quickly as possible
 - Job changes possibe at any time
 - Left and right position can be processed-Standard
 - Ventilation and positioning with front feeder
 - Automatic format/ream setting
 - TRB processes the material on the pallet to 0. No residual ream remains
 - Simple program/recipe management
 - Test mode for creating new programs/recipes
 
Arrangement
- Short distance
 - Direct intervention possible at any time
 - Visual control of the ream by the operator from the cutting machine
 
- No additional ways vs. manual jogger, as the same arrangement
 - No residual ream that has to be fed into the system manually
 - AirGo Jog is in the operator's immediate field of vision
 - Protruding individual sheets are directly visible and the ream can be applied manually
 - Minimum space requirement